A specialist marketplace by BottlingScoutBottlingScout.com ↗

BottlingScout knowledge

Buying checklist

complete-line scope, integration and sustainable output · international beverage production

Independent checklists for inspection, comparison, relocation and commissioning. This guide is written for industrial buyers comparing complete lines and should be adapted to the actual machine and production project.

01

Define the application

Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.

For Bottling Used Lines, pay particular attention to complete-line scope, integration and sustainable output.

02

Compare like with like

Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.

For Bottling Used Lines, pay particular attention to complete-line scope, integration and sustainable output.

03

Build the delivered cost

Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.

For Bottling Used Lines, pay particular attention to complete-line scope, integration and sustainable output.