Compare the scope of each line before comparing its headline speed. Map what is included, what is missing and how each machine connects to the next.
- Which conveyors, controls and change parts are included?
- Where does the line lose output during a normal production run?
Compare the scope of used bottling lines
Create a module-by-module comparison rather than a list of quoted speeds. Record every conveyor, accumulation table and inspection device. Mark equipment that is excluded or separately priced so a cheaper quotation does not conceal a larger integration project.
Define the application
Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.
Compare like with like
Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.
Build the delivered cost
Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.