Independent checklists for inspection, comparison, relocation and commissioning. This guide is written for industrial buyers comparing complete lines and should be adapted to the actual machine and production project.
Define the application
Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.
For Bottling Used Lines, pay particular attention to complete-line scope, integration and sustainable output.
Compare like with like
Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.
For Bottling Used Lines, pay particular attention to complete-line scope, integration and sustainable output.
Build the delivered cost
Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.
For Bottling Used Lines, pay particular attention to complete-line scope, integration and sustainable output.