Compare the scope of each line before comparing its headline speed. Map what is included, what is missing and how each machine connects to the next.
- Which conveyors, controls and change parts are included?
- Where does the line lose output during a normal production run?
Find the weakest interface
During inspection, follow containers through the entire line and record stops, rejects and manual interventions. Check how the controls exchange signals and how accumulation behaves. A filler running alone does not demonstrate the output of the assembled line.
Verify identity and scope
Match serial plates, year, manuals, electrical drawings and the seller’s equipment list to every module offered.
Inspect condition
Check wear parts, lubrication, bearings, product-contact areas, safety systems, controls, obsolescence and visible modifications.
Test with evidence
Whenever possible run the equipment with representative product and formats, recording speed, rejects, alarms and changeover requirements.